Like a code profiler, every second of a simulated delivery cycle is charged to a stage and a cause: service, queue wait or a physics-limited hold. Pick a stage to see which interactions create the delay, then apply the design fix and watch the bottleneck move. Values are illustrative; in the Phase II prototype they come from the DES/OpenMDAO loop.
Profile · hot path first
Interactions creating the bottleneck
Trace · one delivery cycle
Selected stage
- Interaction chain
- Physics behind the delay
- Design lever
Illustrative notional cycle, not mission data. The proposed Control Tower computes these profiles from a discrete-event simulation of the depot/OTV network coupled to OpenMDAO, with fuel-processing (two-phase chilldown and boil-off), rendezvous (plume exposure) and damage-accumulation models. Ground analogue links open the LuminaFlows Kennedy Space Center twin, where the same kind of interaction is shown with simulated LuminaBox telemetry.